Volltext verfügbar nach Anmeldung bzw. im Campus-Netz.
Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times.
In: International Journal of Production Research, Jg. 47 (2009-06-15), Heft 12, S. 3205-3217
Online
academicJournal
Zugriff:
This paper proposes a simulated annealing-based meta-heuristic to minimise makespan in a flowshop manufacturing cell with sequence-dependent family setup times. To escape from local minima, Cauchy function - rather than the Boltzmann function - is used during the annealing process. The effectiveness and efficiency of the proposed simulated annealing-based meta-heuristic is compared against the existing heuristics on a benchmark problem dataset used in earlier studies. These computational results show that the proposed simulated annealing-based meta-heuristic is highly effective as compared to the state-of-the-art meta-heuristics for this problem on the same benchmark instances. [ABSTRACT FROM AUTHOR]
Titel: |
Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times.
|
---|---|
Autor/in / Beteiligte Person: | Lin, Shih-Wei ; Gupta, Jatinder N.D. ; Ying, Kuo-Ching ; Lee, Zne-Jung |
Link: | |
Zeitschrift: | International Journal of Production Research, Jg. 47 (2009-06-15), Heft 12, S. 3205-3217 |
Veröffentlichung: | 2009 |
Medientyp: | academicJournal |
ISSN: | 0020-7543 (print) |
DOI: | 10.1080/00207540701813210 |
Schlagwort: |
|
Sonstiges: |
|