Volltext verfügbar nach Anmeldung bzw. im Campus-Netz.
A heuristic for adaptive production scheduling and control in flow shop production.
In: International Journal of Production Research, Jg. 49 (2011-06-01), Heft 11, S. 3151-3170
Online
academicJournal
Zugriff:
Although research in flow shop production scheduling has been carried out for many decades, there is still a gap between theoretical research and industrial applications - especially in some manufacturing paradigms in which adaptive production control is necessary, such as in one-of-a-kind production (OKP). This paper presents an average processing time and lever (APT-LVR) heuristic, integrated with a closed-loop feedback control scheme, to achieve adaptive production scheduling and control in flow shop production. Having been implemented in a local OKP company, our APT-LVR based production scheduling and control system demonstrates a significant potential to improve the company's production efficiency and competitiveness. [ABSTRACT FROM AUTHOR]
Titel: |
A heuristic for adaptive production scheduling and control in flow shop production.
|
---|---|
Autor/in / Beteiligte Person: | Li, Wei ; Luo, Xinggang ; Xue, Deyi ; Tu, Yiliu |
Link: | |
Zeitschrift: | International Journal of Production Research, Jg. 49 (2011-06-01), Heft 11, S. 3151-3170 |
Veröffentlichung: | 2011 |
Medientyp: | academicJournal |
ISSN: | 0020-7543 (print) |
DOI: | 10.1080/00207540903575385 |
Schlagwort: |
|
Sonstiges: |
|